How to Draw a Site Plan for a Fence Permit (Without a Costly Surveyor)
When property owners decide to install a new fence, their first thoughts usually revolve around materials, aesthetics, and labor costs. You might spend hours browsing design ideas, comparing the look of classic cedar pickets against modern composite panels, or calculating how many linear feet of vinyl you need to purchase.
However, before the first post hole is dug, there is a critical regulatory hurdle that every homeowner must cross: obtaining a municipal building permit.

Before you begin
In the vast majority of jurisdictions across the United States, installing a new fence—or replacing an existing one—requires formal approval from your local zoning or building department. To grant this approval, municipal reviewers don’t just want to know what your fence will look like. They need to see exactly where it will sit in relation to your property boundaries, existing structures, and public rights-of-way.
To provide this information, you must submit a detailed layout document known as a site plan.
The mention of a site plan often triggers immediate financial anxiety for homeowners. The common assumption is that you need to hire a licensed land surveyor to come out to your property, spend hours shooting lines with specialized equipment, and hand you a bill for $800 to $2,500 just to clear the way for a simple backyard fence.
Fortunately, for standard residential fence installations, hiring an expensive land surveyor is rarely a legal or practical requirement.
By utilizing public records, local Geographic Information System (GIS) data, and professional drafting standards, you can secure a permit-ready document that satisfies municipal reviewers at a fraction of the cost.
This comprehensive guide will walk you through everything you need to know about preparing a site plan for a fence permit, understanding local zoning mandates, navigating invisible property restrictions, and avoiding the common documentation mistakes that lead to costly project delays.
In this guide
Jump directly to the section you need.
Why Fences Are Heavily Regulated by Municipalities
It is easy to view a fence permit application as unnecessary bureaucratic red tape. After all, you are simply enclosing your own yard. Why should the local government care where a residential fence is placed?
The reality is that municipal building departments enforce local zoning ordinances to protect public safety, maintain neighborhood aesthetics, prevent property disputes, and safeguard essential infrastructure. A site plan is the primary tool a zoning reviewer uses to verify that your proposed fence complies with these community standards.
When a reviewer looks at your application, they are checking for several specific regulatory factors:
1. Verification of Setback Compliance
Zoning laws dictate exactly how close a structure can be built to a property line. These minimum distances are called setbacks. While some municipalities allow fences to be placed directly on the property boundary, many enforce strict setback regulations depending on the zone, the height of the fence, and whether the fence is located in a front, side, or rear yard.
A site plan provides the precise, measurable dimensions that prove your fence stays within the legally allowable building envelope.
2. Height Limitations and Zoning Restrictions
Fences are rarely treated equally across an entire residential lot. Most local ordinances enforce distinct height tiers based on location:
- Front Yards: Typically restricted to a maximum height of 3 to 4 feet to maintain visibility and neighborhood openness.
- Rear and Side Yards Fences: Usually permitted to stand up to 6 or 8 feet high to provide adequate privacy.
If your layout document does not clearly differentiate between your front yard and backyard boundaries, a municipal reviewer cannot verify if your proposed heights comply with local code.
3. Clear Sight Triangles at Intersections
For properties located on corner lots, fence placement becomes a matter of public safety. Municipalities enforce strict “sight triangle” or “clear visibility triangle” rules at street intersections and where driveways meet the public sidewalk. Fences built too close to the corner can block the line of sight for oncoming motorists, creating hazardous traffic conditions. Reviewers use scaled site plans to calculate these visibility triangles mathematically before granting approval.
4. Encroachment Prevention
Once a fence is built, moving it is an expensive, labor-intensive nightmare. If a homeowner accidentally installs a fence even a few inches past their actual property line, they have encroached onto neighboring land. This can result in civil lawsuits, title issues during future property sales, or forced demolition orders from local code enforcement.
A professionally prepared technical layout helps prevent these disputes before construction ever begins by grounding the project in official public records.

The Core Elements of a Permit-Ready Fence Site Plan
A simple, handwritten sketch on a piece of graph paper or a basic printout of an online aerial map is almost never enough to pass municipal review. As explored in our comprehensive GIS Land Records & Professional Site Verification Guide, building departments require highly structured, technical documentation that conforms to specific drafting benchmarks.
To be considered “permit-ready,” your fence site plan must include the following essential elements:
Property Boundaries and Dimensions
The blueprint must illustrate the complete, unbroken boundary lines of your legal parcel exactly as they are recorded in official county land records. Each boundary line must be accompanied by its precise linear footage (e.g., a rear property line labeled as 131 feet).
Existing Structural Improvements
The plan must map the footprint of all permanent structures currently existing on the lot. This includes your primary residence, detached garages, driveways, walkways, patios, decks, and any accessory buildings like storage sheds. Reviewers need to see these elements to evaluate the spatial context of the entire property.
The Proposed Fence Line
The location of the new fence must be clearly drawn using a distinct graphical line style (often a dashed line or a line with a recurring “X” pattern). The plan must explicitly state the total linear feet of the proposed fence, the locations of all access gates (including their widths), and the exact height and material of the fence sections.
Setback Dimensions and Measurements
The document must feature clear dimension strings showing the exact distance from the proposed fence line to the legal property boundaries, as well as the distance to the primary residence and adjacent structures. These measurements must be mathematically accurate and verifiable against the document’s established scale.
Title Block and Administrative Metadata
Every professional layout requires an organized title block, typically located in the bottom right corner. This block must feature the property owner’s name, the full physical address of the project site, the specific date the plan was drafted, the legal parcel number (APN), and a statement of the document’s intended use.
Scale Bar and Orientation
The drawing must be constructed using a standard engineering scale (such as 1 inch = 20 feet or 1 inch = 30 feet). A graphical scale bar must be included so reviewers can verify dimensions manually if needed. Additionally, a clear North arrow must be present to establish the proper geographic orientation of the lot.
At Prime Site Plan, our Standard Site Plan package incorporates every single one of these mandatory architectural elements, ensuring your documentation looks highly professional, organized, and ready for immediate administrative processing.
Why a GIS-Based Site Plan Beats an Expensive Land Survey
When homeowners ask their local building department what documentation they need for a fence permit, the staff will frequently state that they require a “survey or site plan showing property lines.” Because the word “survey” is mentioned first, many people assume they have no choice but to call a local engineering firm and schedule a physical field survey.
It is important to understand the difference between a physical boundary survey and a professional site plan built on Geographic Information System (GIS) data.
A physical land survey involves a licensed surveyor physically traveling to your property with tripods, GPS rovers, and metal detectors. They hunt for historical iron pins buried in the ground, measure physical angles, and legally certify the exact locations of the dirt boundaries. This level of fieldwork is highly specialized, which is why it commands a premium price tag often exceeding a thousand dollars.
While a physical boundary survey is absolutely necessary if you are involved in a bitter legal dispute with a neighbor over a property line, or if you are constructing a major structural home addition right on a building restriction line, it is generally total overkill for a residential fence permit.
Most modern municipalities have spent the last two decades compiling highly accurate, layered public records within their regional Geographic Information System (GIS) databases. These systems integrate official county plat maps, recorded deeds, historical subdivision surveys, and updated satellite imagery into a unified digital infrastructure.
A professional drafting company can access these official public datasets to extract your exact legal parcel boundaries, plot your home’s footprint, and overlay your proposed fence line with millimeter precision inside Computer-Aided Design (CAD) software.
By opting for a professional GIS-based site plan instead of an on-site physical survey, you experience massive benefits:
| Feature / Benefit | Physical Land Survey | GIS-Based Professional Site Plan |
|---|---|---|
| Average Cost | $800 – $2,500+ | Fraction of the cost ($99 – $199) |
| Turnaround Time | 2 to 6 weeks (dependent on field schedules) | 24 to 48 hours |
| Physical Property Disruption | Surveyors walking your lot, driving stakes into lawns | Completely digital, remote, and non-invasive |
| Permit Acceptance | Accepted by all municipalities | Accepted by the vast majority of US building departments |
| Digital Reusability | Often provided as a flat paper printout | Clean digital CAD file easily updated for future projects |
Choosing a digital, record-grounded layout allows you to maintain total momentum on your backyard project without draining your construction budget before you even purchase your fence posts.

Regional Breakdown: Fence Rules Across the United States
Zoning codes are inherently hyper-local. A fence project that requires zero paperwork in a rural agricultural area might trigger extensive administrative reviews in a densely populated metropolitan suburb.
To help you understand how varied these regulations are, let’s explore some of the real-world fence permitting frameworks enforced in major municipal jurisdictions across various regions of the country:
California (e.g., Los Angeles & San Diego)
In California, fence regulations are heavily intertwined with neighborhood density and fire safety laws. In Los Angeles, fences located within a required front yard setback are strictly capped at a maximum height of 3.5 feet, while rear and side yard fences can go up to 6 feet or 8 feet depending on the zoning district.
Furthermore, many California municipalities enforce strict “Good Neighbor Fence” laws. If a fence is built directly on a shared boundary line, both property owners are legally presumed to benefit equally from it and are shared responsible for its maintenance costs.
A precise GIS-based site plan is essential here to prove that a proposed fence does not cross into a neighboring property or infringe on public easements.
Texas (e.g., Houston & Austin)
Texas presents a unique regulatory environment. The City of Houston is famous for not having traditional zoning laws, but it enforces extensive structural ordinances and subdivision deed restrictions (HOAs). In Austin, a permit is explicitly required for any fence that exceeds 8 feet in height.
However, regardless of height permit triggers, Austin enforces tight regulations regarding drainage. Fences built across designated overland flow paths or within flood hazard zones must feature specific ground clearances (such as a 2-inch gap at the bottom) to allow stormwater to pass through unimpeded.
A professional site plan is used by Texas reviewers to cross-reference fence lines against regional watershed maps.
Florida (e.g., Miami-Dade County & Orlando)
Florida boasts some of the absolute strictest building codes in the entire world due to high-velocity hurricane zones (HVHZ). In Miami-Dade County, all new fences require a building permit, regardless of height or material. Reviewers must verify that the fence posts are designed to withstand wind loads exceeding 140 mph.
From a mapping perspective, Florida properties are heavily crisscrossed with expansive utility and drainage easements due to the state’s high water table and intricate canal systems. Homeowners must submit highly accurate, scaled documents to prove their fence posts will not punch through underground public conduits or block vital neighborhood runoff paths.
New York & The Northeast
In older, historic northeastern municipalities, property boundaries are rarely uniform squares. Lots are often irregular, featuring non-parallel side lines and historical utility access routes that date back over a century. In many New York suburban towns, any fence over 6 feet requires a full zoning variance, a lengthy public process that can be entirely avoided if the homeowner presents a professional site plan proving their layout stays within standard 4-to-6-foot regional bounds.
Deep Dive into Invisible Property Restrictions
When developing a residential site plan, a draftsman looks past the simple aerial photograph of your yard to map out the invisible legal matrices that govern your land. Understanding these hidden elements before ordering your fence is the best way to safeguard your investment.
1. The Complex World of Utility Easements
A utility easement is a legally binding right-of-way granted to utility companies or public works departments. These corridors can run along your rear property line, slice through your side yards, or cut directly across the middle of your open lawn.
- Access Requirements: Even if you technically own the dirt beneath a utility easement, you cannot restrict access to it. If a utility provider needs to service an underground water main, replace a natural gas pipe, or fix an electrical conduit, they have the legal authority to enter your property.
- The Demolition Risk: If you install an expensive, custom vinyl or masonry fence directly inside a recorded utility easement, the utility company has the legal right to cut down, dismantle, or bulldoze your fence to gain access to their infrastructure. In the vast majority of cases, they are not legally obligated to pay you a single dollar to replace the damaged fence.
Mapping these exact boundaries prevents this financial catastrophe.
2. Drainage Corridors and Stormwater Management
Modern suburban developments are carefully graded by engineers to control stormwater runoff. Water is directed down engineered slopes, collected in subtle depressions called swales, and channeled out toward public storm drains.
- The “Dam Effect”: If you install a solid wooden or vinyl privacy fence directly across a drainage swale, the solid panels will act exactly like a small dam. During a heavy downpour, the fence will trap the water, creating a standing pool in your yard or, worse, flooding your neighbor’s property.
- Civil Liabilities: If your unpermitted or improperly mapped fence causes structural water damage to a neighboring home’s foundation or ruins their landscaping, you can be held entirely liable for the repair bills in a civil court of law. A professional site plan flags these grading structures, allowing you to choose open ornamental fencing or add proper bottom clearances to maintain natural hydrologic flow.
3. Public Rights-of-Way and Encroachments
As mentioned previously, your actual property line almost never reaches the edge of the asphalt street pavement.
- The Grassy Strip Trap: Many homeowners assume that everything up to the concrete sidewalk belongs to them. In reality, the city’s public right-of-way typically extends several feet past the sidewalk into your front lawn.
- Encroachment Penalties: If you build your front fence within this public right-of-way corridor, you have technically encroached onto government property. Code enforcement officers can issue immediate citations, levy daily fines, and force you to remove the structure immediately at your own expense.
Step-by-Step: How to Prepare Your Property Information for a Fence Plan
If you decide to leverage a professional drafting service like Prime Site Plan to create your fence permit document, you do not need to know how to use complex CAD software or understand advanced engineering principles. However, you do need to collect a few basic pieces of information about your property and your upcoming project to ensure the drafting process goes perfectly smoothly.
Follow these simple steps to prepare your project data:
Step 1: Retrieve Your Existing Property Documents
Check your personal financial records from when you originally purchased your home. In your closing documents, you will frequently find a copy of an old plot map, a mortgage survey, or a real estate title report. Even if these documents are decades old, blurry, or missing recent improvements, they contain invaluable legal data—such as exact boundary lengths and bearing angles—that our drafting team can use to anchor your new, clean digital layout.
Step 2: Determine Your Local Zoning Rules for Fences
Before finalizing where you want your fence to go, call your local zoning department or check their online municipal code portal. Ask a few foundational questions:
- What is the maximum allowable fence height for my specific zoning district (front yard vs. backyard)?
- Are fences allowed to be built directly on the property line, or is there a mandatory setback (e.g., 1 foot or 2 feet off the line)?
- Does the city require the “finished side” (the pretty side) of the fence to face outward toward my neighbors and the street?
Knowing these rules in advance ensures your proposed layout complies with local laws on the very first draft.
Step 3: Outline Your Proposed Fence Paths
Take a walk out into your yard and visualize exactly where you want the new fence to run. Note where you want to place access gates and how wide those gates need to be (for example, a 4-foot gate for a standard lawnmower or a double 8-foot gate if you need to pull a boat or utility trailer into the backyard). Jot down a rough, simple description or draw a basic sketch indicating which sides of the yard you want enclosed.
Step 4: Identify Existing Obstacles and Utilities
Take note of any major visible property features that might influence your fence path. Are there large, mature trees growing directly on the property boundary? Is there an asphalt driveway that your fence will need to cross or run alongside?
If your property features highly complex terrain, dramatic slope changes, or major retaining structures along the boundary line, you may want to explore our specialized Retaining Walls & Steep Slopes Guide to see how elevation shifts impact permit mapping.
Once you have gathered these basic project details, you simply upload them through our secure online order portal. Our professional drafting team takes over from there, cross-referencing your notes against official county GIS records to build a flawless, permit-ready document.

5 Common Property Mapping Mistakes That Delay Fence Permits
Over our years of drafting thousands of residential layouts for homeowners across the country, we have seen building departments issue countless “Requests for Revision” and permit denials. The vast majority of these costly project delays do not happen because the homeowner’s underlying construction concept is bad. They happen because the documentation supporting the application contains simple, preventable mapping errors.
By understanding these five common property mapping mistakes in detail, you can ensure your application sails through the municipal review process without a hitch:
1. Assuming Fences or Hedges Mark the Legal Property Line
This is the single most common mistake made by property owners. Homeowners naturally look at an old wooden fence installed by a previous owner twenty years ago, or a neat row of mature arborvitae trees, and assume: “That must be exactly where my property ends.”
- The Reality of Discrepancies: Fences are frequently installed several feet inside an actual boundary line simply to avoid cutting down trees, navigate rocks, or comply with historical verbal agreements between neighbors.
- The Permitting Fallout: If you base your new permit application on the placement of old physical landmarks rather than verified legal records, your entire layout will be fundamentally inaccurate from day one. A reviewer who cross-references your submission against the official county plat map will immediately spot the variance and bounce your application back for corrections.
2. Measuring Setbacks from Buildings Instead of Property Boundaries
When filling out a permit application form, homeowners often write down notes like: “My new fence will be 15 feet away from my house.” While that is helpful spatial context, zoning reviewers do not measure fence compliance based on the distance to your kitchen window.
- The Statutory Focus: They measure setbacks strictly from the legal property boundary line.
- Drafting Correction: Your site plan must always feature explicit dimension strings that anchor the proposed fence line directly to the official parcel boundaries. Failing to include these explicit line-to-line annotations forces the reviewer to guess the distance, and municipal reviewers do not guess—they reject.
3. Relying Solely on Basic Online Satellite Screenshots
As we highlight extensively in our Why a Google Earth Screenshot Isn’t Enough Guide, raw aerial imagery features significant limitations.
- Optical Distortions: Satellite and airplane cameras capture images from thousands of feet in the air. Depending on the curvature of the earth and the angle of the lens, buildings can appear shifted, and straight property lines can look completely curved.
- Visual Obstructions: Massive tree canopies, roof eaves, and long evening shadows actively obscure where the actual ground lines meet. If you attempt to use a basic web browser markup tool to trace a fence line over a standard aerial photograph, your line placements can easily be off by several feet. Municipal reviewers will immediately spot these visual inaccuracies and reject the document.
4. Leaving Existing Hardscapes Off the Document
A site plan is meant to be a comprehensive representation of the property’s current layout.
- The Omission Trap: If you omit your concrete patio, your asphalt driveway, your gravel walkways, or an old detached storage shed from the drawing, the zoning reviewer will view the document as incomplete.
- Zoning Calculations: Furthermore, many cities track Lot Coverage—the total percentage of your land covered by impervious surfaces. They need to see all existing hardscapes to verify that your new fence posts or adjacent projects do not violate regional zoning thresholds. Leaving these items off can lead to a formal rejection due to incomplete zoning documentation.
5. Neglecting Future Backyard Projects During Initial Planning
Many homeowners view their property improvements as completely isolated events. Today you are installing a fence. Next year, you might want to build a backyard storage shed, pour a new concrete patio, or install an inground swimming pool.
- The Short-Sighted Approach: If you draft a basic, throwaway sketch that only shows the fence, you will have to start completely from scratch for your next permit application.
- Building a Foundation: Investing in a highly accurate, professional site plan today gives you a permanent digital foundation. When you are ready to expand your outdoor space, you can easily reference our specialized resources—like our Shed Permits Guide or our highly requested Pool Permit Site Plan Guide—and quickly update your existing layout file, saving massive amounts of time and money down the road.
Technical Appendix: How GIS and CAD Form a Flawless Site Plan
To completely strip away the mystery of how a professional drafting company creates a permit-ready document without visiting your home, let’s look under the hood at the exact technical process used inside professional Computer-Aided Design (CAD) environments:
Data Ingestion and Coordinate System Matching
Every professional site plan begins by pulling raw data from official government GIS nodes. These files contain precise coordinates mapped out using specific regional coordinate systems (such as the State Plane Coordinate System in the US). By aligning the digital drawing environment with these exact geographic coordinates, the draftsman ensures that the digital map matches the actual physical earth down to a fraction of an inch.
Vectorization of Parcel Geometry
Unlike flat pixels in a JPEG photo, CAD software works with vectors—mathematical lines drawn between exact coordinates. The draftsman inputs the official legal description of your lot (found on your deed) which outlines the exact bearing angles (e.g., $North\ 89^\circ 45’\ 12”\ East$) and distance values. The software uses this algorithmic data to construct an absolute, mathematically closed polygon representing your legal parcel boundary.
Integration of Layered Public Assets
Once the property boundary polygon is locked down, the draftsman imports additional verified data layers from public agencies:
- The Planimetric Layer: Maps out public infrastructure like road centerlines, curb lines, sidewalk edges, and utility poles.
- The Orthophotography Layer: High-resolution, georeferenced aerial imagery that is mathematically stretched and corrected to remove terrain camera distortion, allowing the draftsman to accurately trace the structural foundation of your home.
- The Environmental Overlays: Maps designated flood zones, wetland boundaries, and local zoning district boundaries.
Dimensioning and Annotation Annotation
With all visual and legal assets perfectly aligned, the software’s measurement engine generates exact dimension strings. Because the vectors are anchored to real geographic coordinate data, the resulting distances shown on your final plan are not visual estimates—they are precise, mathematically verified layout facts that municipal reviewers can rely on completely.
Frequently Asked Questions About Fence Permits
Do I really need a permit just to replace an old, broken fence?
In most jurisdictions, yes. While some cities allow “ordinary maintenance and repairs” (like replacing a few broken pickets) without a permit, completely replacing an entire fence line or changing the height, material, or footprint almost always triggers the requirement for a new zoning review and building permit. Always double-check with your local building department to avoid code enforcement fines.
Can I build my fence directly on the property line?
The answer depends entirely on your local zoning district ordinances. Some progressive municipalities actively encourage building fences directly on the property boundary line to maximize yard usage, often requiring written, notarized consent from the adjacent neighbor (a neighbor boundary agreement).
Other cities enforce a strict fence setback mandate, requiring the structure to sit 6 inches, 1 foot, or even 2 feet inside your legal boundary line to ensure all maintenance can be performed without trespassing on neighboring land.
What is a "Good Neighbor" fence rule?
Many local zoning ordinances require that fences installed adjacent to public roads or neighboring properties be oriented so that the structural elements (the posts and horizontal rails) face inward toward the interior of the lot, leaving the clean, smooth, “finished side” facing outward. This is done to maintain neighborhood visual appeal.
How are fence heights measured on sloped properties?
If your lot is located on a hillside or features gradual grade shifts, municipalities generally measure fence height from the natural ground elevation directly adjacent to the base of the fence panels.
If you are constructing a fence on top of a retaining wall, the city will often calculate the “total combined height” (retaining wall height plus fence height) from the lowest grade point. For complex sloped properties, we highly recommend reading our Retaining Walls & Steep Slopes Guide.
What happens if I build my fence without a permit?
If you proceed with construction without a valid permit, you run a massive risk. If a city code enforcement officer spots the project, or if a neighbor files a formal complaint, the city can issue an immediate “Stop Work Order” and hit you with substantial financial penalties.
In worst-case scenarios, if the city discovers that your unpermitted fence encroaches onto a public right-of-way, blocks a clear visibility triangle, or sits within a critical utility easement, they have the legal authority to force you to tear the fence down completely at your own expense.
How long does it take to get a professional fence site plan drafted?
At Prime Site Plan, we understand that you want to get your backyard project moving as fast as possible. When you order our standard mapping services, our team utilizes advanced GIS data feeds and professional CAD software to deliver your completed, permit-ready technical site plan within 24 to 48 hours.
Final Thoughts: Move Forward with Confidence
Planning a new residential fence should be an exciting home improvement milestone, not a source of intense administrative stress and unexpected financial drain. You do not need to let the fear of municipal paperwork stall your project momentum, and you certainly do not need to hand thousands of dollars over to a private land surveyor just to clear a simple regulatory hurdle.
By moving away from unreliable hand-drawn sketches and avoiding the trap of basic online screenshots, you can present municipal reviewers with an organized, accurate, and professional document that commands respect and triggers fast administrative approval.
A professional, record-grounded layout eliminates guesswork, insulates you from future legal boundary disputes with neighbors, and provides a powerful digital asset that supports your property development goals for years to come.
At Prime Site Plan, we specialize in taking the stress out of the permitting process. We combine verified public records, official regional GIS datasets, and professional drafting standards to deliver high-quality, permit-ready residential site plans for homeowners, contractors, and designers in all 50 states.
Are you ready to secure your building permit and get your fence installation underway? Choose the perfect professional layout package for your project below and let our expert drafting team deliver the precise documentation you need today.
Continue Planning Your Property
If you are researching the specific zoning rules and structural permitting guidelines for other upcoming residential property improvements, explore our complete library of expert property planning guides:
- Pool Permit Site Plan Guide – Learn how setbacks, safety enclosures, and lot coverage calculations influence swimming pool approvals.
- Deck & Patio Zoning Guide – Understand how hardscape expansions, pergolas, and elevated decks interact with local municipal codes.
- Shed Permits Guide – A comprehensive look at height limitations, square footage thresholds, and setback boundaries for accessory buildings.
- ADU Development & Property Layout Guide – Master the complex zoning rules, utility connections, and structural layouts required for accessory dwelling units and tiny homes.
- Retaining Walls & Steep Slopes Guide – A detailed look at engineering thresholds, elevation profiles, and grading plans for sloped lots.
Choose the right site plan for your project
Both options are professionally drafted to support a clearer municipal review for adus & development projects.
Standard Site Plan
Detailed, permit-ready drawing with boundaries, structures, and dimensions — ideal for most residential permits.
Elite Site Plan
High-detail plan with zoning data and advanced measurements — recommended for complex lots and major projects.
